Non-competed awards
$53.7M

obligated to date on 34 non-competed awards of $1M+ signed FY2024–26

USAspendingas of Oct 3

Obligated to date, not spending in a year. Selected awards only (rule r5-v1): not this company's not-competed share.

Awards in our records
34

34 non-competed ($1M+) · 0 other ($10M+)

USAspendingas of Oct 3
Largest award
$2.0M

obligated to date: W911S725FA221, Department of Defense, signed FY2025

USAspendingas of Oct 3
Member trades
No ticker

No confirmed stock ticker, so no member trades are matched to this company.

House Clerk + Senate eFDas of Oct 4
Source: USAspending.gov · SEC EDGAR company tickers · House Clerk PTRs · Senate eFDCoverage: Contract awards FY2024–FY2026 · Ticker links FY2024–26 recipients · House 2021–2026 · Senate 2024–2026Updated: Methodology →

Federal contract awards in our records

Each row is one prime contract award on USAspending.gov; “USAspending” opens its official page.

What this table covers: every award signed in FY2024–26 that the agency coded “not competed” and that is $1 million or more, plus any award of $10 million or more (rule r5-v1). Smaller competed awards are not in it, so it is not this company’s total federal business and it cannot show a not-competed share. “Obligated to date” is the total committed on the award so far, including later modifications (USAspending, as of Oct 3, 2026), not the amount at any earlier date.

Awards by fiscal year signed (obligated to date, not spending in the year)
Signed inNon-competed awardsObligated to dateOther awards $10M+Obligated to date
FY202412$18.4MNone in this set—
FY202512$19.1MNone in this set—
FY2026incomplete10$16.2MNone in this set—

FY2026 is incomplete: the Department of Defense reports contract actions 90 days late, and older awards keep growing through modifications, so these amounts will rise. Source: USAspending.gov, as of Oct 3, 2026.

FY2024–26 awards to SHO-ME POWER ELECTRIC COOPERATIVE, largest first (obligated to date)
Source
W911S725FA221Order under IDV W911S725DA006SHOME JULY 2025 FUNDINGDepartment of DefenseJul 1, 2025FY2025Not available for competitionUtilities (FAR 6.302-1(b)(3))$2,016,298USAspending
W911S726FA156Order under IDV W911S725DA006SHO-ME POWER ELECTRIC COOPERATIVE: FORT LEONARD WOOD ELECTRIC SERVICEDepartment of DefenseMay 19, 2026FY2026Not available for competitionUtilities (FAR 6.302-1(b)(3))$1,992,660USAspending
W911S725FA242Order under IDV W911S725DA006SHOME AUGUST FUNDING 2025Department of DefenseJul 18, 2025FY2025Not available for competitionUtilities (FAR 6.302-1(b)(3))$1,895,577USAspending
W911S726FA144Order under IDV W911S725DA006SHO-ME POWER ELECTRIC COOPERATIVE: FORT LEONARD WOOD ELECTRIC SERVICEDepartment of DefenseMay 8, 2026FY2026Not available for competitionUtilities (FAR 6.302-1(b)(3))$1,887,200USAspending
W911S724F5009Order under IDV W911S717D0205ENERGY RATE. ALL REQUIREMENTS.Department of DefenseJun 12, 2024FY2024Not available for competitionUtilities (FAR 6.302-1(b)(3))$1,850,098USAspending
W911S724F5010Order under IDV W911S717D0205ENERGY RATE. ALL REQUIREMENTS.Department of DefenseJul 17, 2024FY2024Not available for competitionUtilities (FAR 6.302-1(b)(3))$1,841,756USAspending
W911S725FA187Order under IDV W911S725DA006SHOME JUNE FUNDINGDepartment of DefenseJun 12, 2025FY2025Not available for competitionUtilities (FAR 6.302-1(b)(3))$1,812,114USAspending
W911S724F5008Order under IDV W911S717D0205ENERGY RATE. ALL REQUIREMENTS.Department of DefenseMay 15, 2024FY2024Not available for competitionUtilities (FAR 6.302-1(b)(3))$1,774,671USAspending
W911S725FA341Order under IDV W911S725DA006SHOME SEPTEMBER FUNDING 2025Department of DefenseSep 22, 2025FY2025Not available for competitionUtilities (FAR 6.302-1(b)(3))$1,728,146USAspending
W911S726FA132Order under IDV W911S725DA006SHO-ME POWER ELECTRIC COOPERATIVE: FORT LEONARD WOOD ELECTRIC SERVICEDepartment of DefenseApr 24, 2026FY2026Not available for competitionUtilities (FAR 6.302-1(b)(3))$1,676,280USAspending
W911S724F5011Order under IDV W911S717D0205DEMAND CHARGE. BASE LOAD CAPACITY.Department of DefenseAug 15, 2024FY2024Not available for competitionUtilities (FAR 6.302-1(b)(3))$1,635,612USAspending
W911S724F5007Order under IDV W911S717D0205ENERGY RATE. ALL REQUIREMENTS.Department of DefenseApr 23, 2024FY2024Not available for competitionUtilities (FAR 6.302-1(b)(3))$1,624,566USAspending
W911S726FA128Order under IDV W911S725DA006SHO-ME POWER ELECTRIC COOPERATIVE: FORT LEONARD WOOD ELECTRIC SERVICEDepartment of DefenseApr 23, 2026FY2026Not available for competitionUtilities (FAR 6.302-1(b)(3))$1,595,696USAspending
W911S726FA003Order under IDV W911S717D0205SHOME ELECTRIC OCTOBER FUNDING 2025Department of DefenseNov 21, 2025FY2026Not available for competitionUtilities (FAR 6.302-1(b)(3))$1,592,611USAspending
W911S725FA174Order under IDV W911S717D0205SHOME MAY FUNDING 2025Department of DefenseJun 4, 2025FY2025Not available for competitionUtilities (FAR 6.302-1(b)(3))$1,571,669USAspending
W911S726FA030Order under IDV W911S725DA006SHOME JANUARY FUNDING 2026Department of DefenseDec 16, 2025FY2026Not available for competitionUtilities (FAR 6.302-1(b)(3))$1,552,352USAspending
W911S726FA083Order under IDV W911S725DA006SHOME MARCH FUNDING 2026Department of DefenseMar 11, 2026FY2026Not available for competitionUtilities (FAR 6.302-1(b)(3))$1,550,861USAspending
W911S725FA013Order under IDV W911S717D0205SHOME POWER ELECTRIC FUNDING JANUARY 2025Department of DefenseJan 15, 2025FY2025Not available for competitionUtilities (FAR 6.302-1(b)(3))$1,504,191USAspending
W911S725F5101Order under IDV W911S717D0205ENERGY RATE. ALL REQUIREMENTS.Department of DefenseOct 16, 2024FY2025Not available for competitionUtilities (FAR 6.302-1(b)(3))$1,495,940USAspending
W911S725FA066Order under IDV W911S717D0205SHOME ELECTRIC MARCH FUNDING 2025Department of DefenseMar 24, 2025FY2025Not available for competitionUtilities (FAR 6.302-1(b)(3))$1,484,209USAspending
W911S726FA015Order under IDV W911S725DA006SHOME ELECTRIC DECEMBER FUNDING 2025Department of DefenseDec 3, 2025FY2026Not available for competitionUtilities (FAR 6.302-1(b)(3))$1,455,885USAspending
W911S724F5003Order under IDV W911S717D0205DEMAND CHARGE. BASE LOAD CAPACITY.Department of DefenseDec 21, 2023FY2024Not available for competitionUtilities (FAR 6.302-1(b)(3))$1,452,747USAspending
W911S725FA118Order under IDV W911S717D0205SHOME APRIL FUNDING 2025Department of DefenseApr 21, 2025FY2025Not available for competitionUtilities (FAR 6.302-1(b)(3))$1,451,283USAspending
W911S724F5006Order under IDV W911S717D0205ENERGY RATE. ALL REQUIREMENTS.Department of DefenseApr 10, 2024FY2024Not available for competitionUtilities (FAR 6.302-1(b)(3))$1,447,392USAspending
W911S726FA059Order under IDV W911S725DA006SHOME FEBRUARY FUNDING 2026Department of DefenseFeb 17, 2026FY2026Not available for competitionUtilities (FAR 6.302-1(b)(3))$1,440,332USAspending
W911S726FA004Order under IDV W911S725DA006SHOME ELECTRIC NOVEMBER FUNDING 2025Department of DefenseNov 21, 2025FY2026Not available for competitionUtilities (FAR 6.302-1(b)(3))$1,426,572USAspending
W911S724F5000Order under IDV W911S717D0205ENERGY RATE. ALL REQUIREMENTS.Department of DefenseOct 4, 2023FY2024Not available for competitionUtilities (FAR 6.302-1(b)(3))$1,411,898USAspending
W911S725FA031Order under IDV W911S717D0205SHO-ME ELECTRIC FUNDING FEBRUARY 2025Department of DefenseFeb 6, 2025FY2025Not available for competitionUtilities (FAR 6.302-1(b)(3))$1,405,898USAspending
W911S724F5005Order under IDV W911S717D0205ENERGY RATE. ALL REQUIREMENTS.Department of DefenseMar 13, 2024FY2024Not available for competitionUtilities (FAR 6.302-1(b)(3))$1,395,918USAspending
W911S725F5102Order under IDV W911S717D0205ENERGY RATE. ALL REQUIREMENTS.Department of DefenseOct 23, 2024FY2025Not available for competitionUtilities (FAR 6.302-1(b)(3))$1,385,490USAspending
W911S725F5103Order under IDV W911S717D0205ENERGY RATE. ALL REQUIREMENTS.Department of DefenseJan 3, 2025FY2025Not available for competitionUtilities (FAR 6.302-1(b)(3))$1,382,862USAspending
W911S724F5004Order under IDV W911S717D0205ENERGY RATE. ALL REQUIREMENTS.Department of DefenseJan 31, 2024FY2024Not available for competitionUtilities (FAR 6.302-1(b)(3))$1,354,807USAspending
W911S724F5001Order under IDV W911S717D0205ENERGY RATE. ALL REQUIREMENTS.Department of DefenseNov 9, 2023FY2024Not available for competitionUtilities (FAR 6.302-1(b)(3))$1,311,952USAspending
W911S724F5002Order under IDV W911S717D0205DEMAND CHARGE. BASE LOAD CAPACITY.Department of DefenseNov 29, 2023FY2024Not available for competitionUtilities (FAR 6.302-1(b)(3))$1,308,659USAspending

FY2024–26 awards to SHO-ME POWER ELECTRIC COOPERATIVE, largest first (obligated to date)

  • W911S725FA221Order under IDV W911S725DA006SHOME JULY 2025 FUNDING
    Signed
    Jul 1, 2025FY2025
    Competition
    Not available for competitionUtilities (FAR 6.302-1(b)(3))
    Obligated to date
    $2,016,298
  • W911S726FA156Order under IDV W911S725DA006SHO-ME POWER ELECTRIC COOPERATIVE: FORT LEONARD WOOD ELECTRIC SERVICE
    Signed
    May 19, 2026FY2026
    Competition
    Not available for competitionUtilities (FAR 6.302-1(b)(3))
    Obligated to date
    $1,992,660
  • W911S725FA242Order under IDV W911S725DA006SHOME AUGUST FUNDING 2025
    Signed
    Jul 18, 2025FY2025
    Competition
    Not available for competitionUtilities (FAR 6.302-1(b)(3))
    Obligated to date
    $1,895,577
  • W911S726FA144Order under IDV W911S725DA006SHO-ME POWER ELECTRIC COOPERATIVE: FORT LEONARD WOOD ELECTRIC SERVICE
    Signed
    May 8, 2026FY2026
    Competition
    Not available for competitionUtilities (FAR 6.302-1(b)(3))
    Obligated to date
    $1,887,200
  • W911S724F5009Order under IDV W911S717D0205ENERGY RATE. ALL REQUIREMENTS.
    Signed
    Jun 12, 2024FY2024
    Competition
    Not available for competitionUtilities (FAR 6.302-1(b)(3))
    Obligated to date
    $1,850,098
  • W911S724F5010Order under IDV W911S717D0205ENERGY RATE. ALL REQUIREMENTS.
    Signed
    Jul 17, 2024FY2024
    Competition
    Not available for competitionUtilities (FAR 6.302-1(b)(3))
    Obligated to date
    $1,841,756
  • W911S725FA187Order under IDV W911S725DA006SHOME JUNE FUNDING
    Signed
    Jun 12, 2025FY2025
    Competition
    Not available for competitionUtilities (FAR 6.302-1(b)(3))
    Obligated to date
    $1,812,114
  • W911S724F5008Order under IDV W911S717D0205ENERGY RATE. ALL REQUIREMENTS.
    Signed
    May 15, 2024FY2024
    Competition
    Not available for competitionUtilities (FAR 6.302-1(b)(3))
    Obligated to date
    $1,774,671
  • W911S725FA341Order under IDV W911S725DA006SHOME SEPTEMBER FUNDING 2025
    Signed
    Sep 22, 2025FY2025
    Competition
    Not available for competitionUtilities (FAR 6.302-1(b)(3))
    Obligated to date
    $1,728,146
  • W911S726FA132Order under IDV W911S725DA006SHO-ME POWER ELECTRIC COOPERATIVE: FORT LEONARD WOOD ELECTRIC SERVICE
    Signed
    Apr 24, 2026FY2026
    Competition
    Not available for competitionUtilities (FAR 6.302-1(b)(3))
    Obligated to date
    $1,676,280
  • W911S724F5011Order under IDV W911S717D0205DEMAND CHARGE. BASE LOAD CAPACITY.
    Signed
    Aug 15, 2024FY2024
    Competition
    Not available for competitionUtilities (FAR 6.302-1(b)(3))
    Obligated to date
    $1,635,612
  • W911S724F5007Order under IDV W911S717D0205ENERGY RATE. ALL REQUIREMENTS.
    Signed
    Apr 23, 2024FY2024
    Competition
    Not available for competitionUtilities (FAR 6.302-1(b)(3))
    Obligated to date
    $1,624,566
  • W911S726FA128Order under IDV W911S725DA006SHO-ME POWER ELECTRIC COOPERATIVE: FORT LEONARD WOOD ELECTRIC SERVICE
    Signed
    Apr 23, 2026FY2026
    Competition
    Not available for competitionUtilities (FAR 6.302-1(b)(3))
    Obligated to date
    $1,595,696
  • W911S726FA003Order under IDV W911S717D0205SHOME ELECTRIC OCTOBER FUNDING 2025
    Signed
    Nov 21, 2025FY2026
    Competition
    Not available for competitionUtilities (FAR 6.302-1(b)(3))
    Obligated to date
    $1,592,611
  • W911S725FA174Order under IDV W911S717D0205SHOME MAY FUNDING 2025
    Signed
    Jun 4, 2025FY2025
    Competition
    Not available for competitionUtilities (FAR 6.302-1(b)(3))
    Obligated to date
    $1,571,669
  • W911S726FA030Order under IDV W911S725DA006SHOME JANUARY FUNDING 2026
    Signed
    Dec 16, 2025FY2026
    Competition
    Not available for competitionUtilities (FAR 6.302-1(b)(3))
    Obligated to date
    $1,552,352
  • W911S726FA083Order under IDV W911S725DA006SHOME MARCH FUNDING 2026
    Signed
    Mar 11, 2026FY2026
    Competition
    Not available for competitionUtilities (FAR 6.302-1(b)(3))
    Obligated to date
    $1,550,861
  • W911S725FA013Order under IDV W911S717D0205SHOME POWER ELECTRIC FUNDING JANUARY 2025
    Signed
    Jan 15, 2025FY2025
    Competition
    Not available for competitionUtilities (FAR 6.302-1(b)(3))
    Obligated to date
    $1,504,191
  • W911S725F5101Order under IDV W911S717D0205ENERGY RATE. ALL REQUIREMENTS.
    Signed
    Oct 16, 2024FY2025
    Competition
    Not available for competitionUtilities (FAR 6.302-1(b)(3))
    Obligated to date
    $1,495,940
  • W911S725FA066Order under IDV W911S717D0205SHOME ELECTRIC MARCH FUNDING 2025
    Signed
    Mar 24, 2025FY2025
    Competition
    Not available for competitionUtilities (FAR 6.302-1(b)(3))
    Obligated to date
    $1,484,209
  • W911S726FA015Order under IDV W911S725DA006SHOME ELECTRIC DECEMBER FUNDING 2025
    Signed
    Dec 3, 2025FY2026
    Competition
    Not available for competitionUtilities (FAR 6.302-1(b)(3))
    Obligated to date
    $1,455,885
  • W911S724F5003Order under IDV W911S717D0205DEMAND CHARGE. BASE LOAD CAPACITY.
    Signed
    Dec 21, 2023FY2024
    Competition
    Not available for competitionUtilities (FAR 6.302-1(b)(3))
    Obligated to date
    $1,452,747
  • W911S725FA118Order under IDV W911S717D0205SHOME APRIL FUNDING 2025
    Signed
    Apr 21, 2025FY2025
    Competition
    Not available for competitionUtilities (FAR 6.302-1(b)(3))
    Obligated to date
    $1,451,283
  • W911S724F5006Order under IDV W911S717D0205ENERGY RATE. ALL REQUIREMENTS.
    Signed
    Apr 10, 2024FY2024
    Competition
    Not available for competitionUtilities (FAR 6.302-1(b)(3))
    Obligated to date
    $1,447,392
  • W911S726FA059Order under IDV W911S725DA006SHOME FEBRUARY FUNDING 2026
    Signed
    Feb 17, 2026FY2026
    Competition
    Not available for competitionUtilities (FAR 6.302-1(b)(3))
    Obligated to date
    $1,440,332
  • W911S726FA004Order under IDV W911S725DA006SHOME ELECTRIC NOVEMBER FUNDING 2025
    Signed
    Nov 21, 2025FY2026
    Competition
    Not available for competitionUtilities (FAR 6.302-1(b)(3))
    Obligated to date
    $1,426,572
  • W911S724F5000Order under IDV W911S717D0205ENERGY RATE. ALL REQUIREMENTS.
    Signed
    Oct 4, 2023FY2024
    Competition
    Not available for competitionUtilities (FAR 6.302-1(b)(3))
    Obligated to date
    $1,411,898
  • W911S725FA031Order under IDV W911S717D0205SHO-ME ELECTRIC FUNDING FEBRUARY 2025
    Signed
    Feb 6, 2025FY2025
    Competition
    Not available for competitionUtilities (FAR 6.302-1(b)(3))
    Obligated to date
    $1,405,898
  • W911S724F5005Order under IDV W911S717D0205ENERGY RATE. ALL REQUIREMENTS.
    Signed
    Mar 13, 2024FY2024
    Competition
    Not available for competitionUtilities (FAR 6.302-1(b)(3))
    Obligated to date
    $1,395,918
  • W911S725F5102Order under IDV W911S717D0205ENERGY RATE. ALL REQUIREMENTS.
    Signed
    Oct 23, 2024FY2025
    Competition
    Not available for competitionUtilities (FAR 6.302-1(b)(3))
    Obligated to date
    $1,385,490
  • W911S725F5103Order under IDV W911S717D0205ENERGY RATE. ALL REQUIREMENTS.
    Signed
    Jan 3, 2025FY2025
    Competition
    Not available for competitionUtilities (FAR 6.302-1(b)(3))
    Obligated to date
    $1,382,862
  • W911S724F5004Order under IDV W911S717D0205ENERGY RATE. ALL REQUIREMENTS.
    Signed
    Jan 31, 2024FY2024
    Competition
    Not available for competitionUtilities (FAR 6.302-1(b)(3))
    Obligated to date
    $1,354,807
  • W911S724F5001Order under IDV W911S717D0205ENERGY RATE. ALL REQUIREMENTS.
    Signed
    Nov 9, 2023FY2024
    Competition
    Not available for competitionUtilities (FAR 6.302-1(b)(3))
    Obligated to date
    $1,311,952
  • W911S724F5002Order under IDV W911S717D0205DEMAND CHARGE. BASE LOAD CAPACITY.
    Signed
    Nov 29, 2023FY2024
    Competition
    Not available for competitionUtilities (FAR 6.302-1(b)(3))
    Obligated to date
    $1,308,659
34 awards. Source: USAspending.gov award records.
Recipient records grouped under this company (1)

USAspending groups recipients by its parent-company field, which has known errors. Check that the recipients below belong to SHO-ME POWER ELECTRIC COOPERATIVE; the stock link below is made per recipient.

  • SHO-ME POWER ELECTRIC COOPERATIVE34 awards · 34 non-competed, $53.7M obligated to date

Stock ticker

Links between a federal contract recipient and an SEC-registered company, made by a written rule from SEC filings and USAspending records. Only confirmed links are shown.

No confirmed stock ticker: this may be a private company, a subsidiary awaiting review, or not matched to an SEC registrant.

Members of Congress who reported trading this stock

No confirmed stock ticker: this may be a private company, a subsidiary awaiting review, or not matched to an SEC registrant. Without a confirmed ticker, no trades are matched to this company.

Looking for agency-level shares? See non-competed share by agency.