Agencies · awarding agency 097 · DOD
Department of Defense
Share of this agency’s prime contract dollars that it coded “not competed”, by fiscal year, from USAspending’s agency totals.
of contract dollars were not competed: $179B of $374B
Incomplete: DoD reports contract actions 90 days late, so this year will rise.
Contract dollars by fiscal year
All prime contract obligations of the agency, split by the agency's competition code. Every figure is from USAspending's agency totals.
| Fiscal year | All contract obligations | Not competed | Competed | Share not competed |
|---|---|---|---|---|
| FY2024Oct 1 – Sep 30, 2024 | $446B | $187B | $259B | 42.0% |
| FY2025Oct 1 – Sep 30, 2025 | $492B | $232B | $259B | 47.3% |
| FY2026incompleteOct 1 – Sep 30, 2026 | $374B | $179B | $194B | 48.0% |
Source: USAspending.gov agency totals, prime contract types A–D, by contract-action date; fetched Oct 3, 2026. “Not competed” = extent-competed code not available for competition, not competed, not competed under simplified acquisition, or non-competitive delivery order. Orders placed under a competed contract keep its code, so they count as competed. FY2026 is incomplete: this agency's contract actions are reported 90 days late.
Largest non-competed awards in our records
A look at the biggest individual awards behind the share. These rows do not add up to the totals above.
| Source | |||||
|---|---|---|---|---|---|
| N0001925C0070THE PURPOSE OF THIS CONTRACT IS TO AWARD LONG LEAD FUNDING FOR F-35A, F-35B, AND F-35C AIRCRAFT FOR U.S. SERVICES, NON-DOD PARTNERS, AND FMS CUSTOMERS. | LOCKHEED MARTIN CORPORATION | Nov 22, 2024FY2025 | Not competedOnly one source-other (FAR 6.302-1 other) | $4,524,582,239 | USAspending |
| FA865925CB003ADVANCED MEDIUM RANGE AIR-TO-AIR MISSILE (AMRAAM)LOTS 39-40 | RAYTHEON COMPANY | Jul 31, 2025FY2025 | Not competedOnly one source-other (FAR 6.302-1 other) | $3,381,835,581 | USAspending |
| W31P4Q25F0080Order under IDV W31P4Q23D0003GUIDED MULTIPLE LAUNCH ROCKET SYSTEM (GMLRS) AND LOW COST REDUCED RANGE PRACTICE ROCKET (LCRRPR) FY26 RATE PRODUCTION LOT 21 DELIVERY. | LOCKHEED MARTIN CORPORATION | Jun 23, 2025FY2025 | Not competedOnly one source-other (FAR 6.302-1 other) | $2,990,790,259 | USAspending |
| N0003025C0100FY26 TRIDENT PRODUCTION AND DEPLOYED SYSTEMS SUPPORT | LOCKHEED MARTIN CORPORATION | Sep 12, 2025FY2025 | Not competedUnique source (FAR 6.302-1(b)(1)) | $1,340,777,591 | USAspending |
| N0001925C0071FRP20 / FY24 TACTOM AUR (RGM-109E-4AJ) UCA | RAYTHEON COMPANY | Dec 19, 2024FY2025 | Not competedOnly one source-other (FAR 6.302-1 other) | $1,339,549,213 | USAspending |
| W912CH25F0096Order under IDV W56HZV22D0083THE BRADLEY A4 FOLLOW-ON PRODUCTION EFFORT WILL DELIVER M2A4 AND M7A4 VEHICLES FROM VARIOUS INDUCTED LEGACY SOURCE VARIANTS BASED ON THE TDP DEVELOPED UNDER CONTRACT W56HZV-12-C-0358 BRADLEY A4 ECP AND THE TOP-LEVEL VEHICLE DRAWINGS. | BAE SYSTEMS LAND & ARMAMENTS L.P. | Dec 11, 2024FY2025 | Not competedFollow-on contract (FAR 6.302-1(a)(2)(ii/iii)) | $1,080,945,590 | USAspending |
| FA812425F0001Order under IDV FA812418D0001F117 ENGINE SUSTAINMENT SUPPORT FY25 TASK ORDER. | RTX CORPORATION | Oct 4, 2024FY2025 | Not competedOnly one source-other (FAR 6.302-1 other) | $1,078,914,542 | USAspending |
| FA812425F1025Order under IDV FA861118D2850F119 CY25-CY27 ENGINE SUSTAINMENT | RTX CORPORATION | Dec 20, 2024FY2025 | Not competedOnly one source-other (FAR 6.302-1 other) | $1,074,249,937 | USAspending |
| W58RGZ25F0182Order under IDV W58RGZ23D0011MODERNIZED TARGET ACQUISITION DESIGNATION SIGHT/PILOT NIGHT VISION SENSOR (M-TADS/PNVS) INDEFINITE DELIVERY/INDEFINITE QUANTITY II (IDIQ2) | LOCKHEED MARTIN CORPORATION | Jun 6, 2025FY2025 | Not competedOnly one source-other (FAR 6.302-1 other) | $956,764,301 | USAspending |
| N0002425C5409FY24 SM-6 BLK IA TAC AUR | RAYTHEON COMPANY | Dec 20, 2024FY2025 | Not competedOnly one source-other (FAR 6.302-1 other) | $907,674,527 | USAspending |
| FA520925F9094Order under IDV FA520957D0001US OBLIGATION IAW ART. 4 OF THE BASIC CONTRACT, MLC NO. DA-92-557-FEC-28000 (FA5209-57-D-0001) EFFECTIVE 1 OCT 1957. THIS REPORTED CONTRACT AMOUNT IS FOR GOV'T OF JAPAN SHARE. | MINISTRY OF DEFENSE | Oct 1, 2024FY2025 | Not available for competitionInternational agreement (FAR 6.302-4) | $798,445,779 | USAspending |
| FA852625F0002Order under IDV FA852621D0001C-17 GLOBEMASTER III - TOTAL SUSTAINMENT AND MINOR DEVELOPMENT | THE BOEING COMPANY | Apr 1, 2025FY2025 | Not competedOnly one source-other (FAR 6.302-1 other) | $790,316,943 | USAspending |
| W31P4Q25F0082Order under IDV W31P4Q25D0010PRECISION STRIKE MISSILE EARLY OPERATIONAL CAPABILITY- 5 DELIVERY ORDER | LOCKHEED MARTIN CORPORATION | Mar 28, 2025FY2025 | Not competedOnly one source-other (FAR 6.302-1 other) | $787,621,810 | USAspending |
| W912CH25C0055ABRAMS ENGINEERING PROGRAM IS A MODIFICATION TO THE EXISTING ABRAMS FLEET. | GENERAL DYNAMICS LAND SYSTEMS INC. | Jun 30, 2025FY2025 | Not competedOnly one source-other (FAR 6.302-1 other) | $757,058,000 | USAspending |
| W912CH25C0004THE PROCUREMENT OF 150 FLAT-BOTTOM-HULL STRYKER VEHICLES UNDER FMS CASE FOR REPUBLIC OF BULGARIA. | CANADIAN COMMERCIAL CORPORATION | Mar 31, 2025FY2025 | Not available for competitionInternational agreement (FAR 6.302-4) | $678,235,815 | USAspending |
| W31P4Q25F0182Order under IDV W31P4Q23D0014THIS T.O. WILL EXECUTE A UCA FOR DO 003 (FY25 BUY) FOR JAVELIN PRODUCT OFFICE FOR ALL UP ROUND MISSILES, BATTERY COOL UNIT, AND TOOLING WITH A NOT-TO-EXCEED (NTE) OF $900,526,210.44. | RAYTHEON/LOCKHEED MARTIN JAVELIN JV | Aug 27, 2025FY2025 | Not competedFollow-on contract (FAR 6.302-1(a)(2)(ii/iii)) | $675,433,329 | USAspending |
| SPRTA125F0256Order under IDV SPRPA124D001EMANUFACTURE OF HORIZONTAL STABLIZIERS, LEFT, RIGHT AND CENTER FOR THE KC -135 AIRCRAFT. | THE BOEING COMPANY | Sep 25, 2025FY2025 | Not competedOnly one source-other (FAR 6.302-1 other) | $671,827,771 | USAspending |
| W56KGU25F0015Order under IDV W56KGU18D0004THIS TASK ORDER PROVIDES FOR SYSTEMS ENGINEERING RESEARCH AND DEVELOPMENT FOR THE DEPARTMENT OF DEFENSE AND OTHER FEDERAL GOVERNMENT AGENCIES. | THE MITRE CORPORATION | Aug 27, 2025FY2025 | Not competedMobilization, essential r&d (FAR 6.302-3) | $671,027,122 | USAspending |
| W31P4Q25F0031Order under IDV W31P4Q24D0019PURCHASE OF HIMARS FOR US AND FMS | LOCKHEED MARTIN CORPORATION | May 9, 2025FY2025 | Not competedOnly one source-other (FAR 6.302-1 other) | $664,125,096 | USAspending |
| N0002425C5434FY25 LAUNCHER MISSILE MODULE (LMM)- USMC | KONGSBERG DEFENCE & AEROSPACE AS | Nov 12, 2024FY2025 | Not competedOnly one source-other (FAR 6.302-1 other) | $662,576,551 | USAspending |
| SPRBL125F0001Order under IDV SPRBL115D0017ENGINEERING SERVICES CY25 | RAYTHEON COMPANY | Jan 31, 2025FY2025 | Not competedOnly one source-other (FAR 6.302-1 other) | $660,544,154 | USAspending |
| FA862025FB072Order under IDV FA862024GB001BIG SAFARI | AEVEX AEROSPACE, LLC | Dec 2, 2024FY2025 | Not competedNational security (FAR 6.302-6) | $645,778,830 | USAspending |
| W519TC25C0032DESIGN, BUILD, AND COMMISSION A MODERN 155MM LOAD, ASSEMBLE, AND PACK (LAP) FACILITY AT THE IOWA ARMY AMMUNITION PLANT (IAAAP) | MSM GROUP NORTH AMERICA INC. | Aug 15, 2025FY2025 | Not competedPublic interest (FAR 6.302-7) | $635,200,000 | USAspending |
| N0001925C0065NGJ-MB PRODUCTION LOT 4 SYSTEM SHIPSETS, SPARES AND NRE | RAYTHEON COMPANY | Nov 26, 2024FY2025 | Not competedOnly one source-other (FAR 6.302-1 other) | $591,486,317 | USAspending |
| N0001925F0090Order under IDV N0001924G0010THIS CONTRACT PROCURES INITIAL SPARE PARTS FOR FY25 PRODUCTION F-35 AIRCRAFT | LOCKHEED MARTIN CORPORATION | Jul 31, 2025FY2025 | Not competedOnly one source-other (FAR 6.302-1 other) | $583,219,749 | USAspending |
Largest non-competed awards from Department of Defense, FY2025 (obligated to date)
- N0001925C0070THE PURPOSE OF THIS CONTRACT IS TO AWARD LONG LEAD FUNDING FOR F-35A, F-35B, AND F-35C AIRCRAFT FOR U.S. SERVICES, NON-DOD PARTNERS, AND FMS CUSTOMERS.
- Signed
- Nov 22, 2024FY2025
- Competition
- Not competedOnly one source-other (FAR 6.302-1 other)
- Obligated to date
- $4,524,582,239
- FA865925CB003ADVANCED MEDIUM RANGE AIR-TO-AIR MISSILE (AMRAAM)LOTS 39-40
- Signed
- Jul 31, 2025FY2025
- Competition
- Not competedOnly one source-other (FAR 6.302-1 other)
- Obligated to date
- $3,381,835,581
- W31P4Q25F0080Order under IDV W31P4Q23D0003GUIDED MULTIPLE LAUNCH ROCKET SYSTEM (GMLRS) AND LOW COST REDUCED RANGE PRACTICE ROCKET (LCRRPR) FY26 RATE PRODUCTION LOT 21 DELIVERY.
- Signed
- Jun 23, 2025FY2025
- Competition
- Not competedOnly one source-other (FAR 6.302-1 other)
- Obligated to date
- $2,990,790,259
- N0003025C0100FY26 TRIDENT PRODUCTION AND DEPLOYED SYSTEMS SUPPORT
- Signed
- Sep 12, 2025FY2025
- Competition
- Not competedUnique source (FAR 6.302-1(b)(1))
- Obligated to date
- $1,340,777,591
- N0001925C0071FRP20 / FY24 TACTOM AUR (RGM-109E-4AJ) UCA
- Signed
- Dec 19, 2024FY2025
- Competition
- Not competedOnly one source-other (FAR 6.302-1 other)
- Obligated to date
- $1,339,549,213
- W912CH25F0096Order under IDV W56HZV22D0083THE BRADLEY A4 FOLLOW-ON PRODUCTION EFFORT WILL DELIVER M2A4 AND M7A4 VEHICLES FROM VARIOUS INDUCTED LEGACY SOURCE VARIANTS BASED ON THE TDP DEVELOPED UNDER CONTRACT W56HZV-12-C-0358 BRADLEY A4 ECP AND THE TOP-LEVEL VEHICLE DRAWINGS.
- Signed
- Dec 11, 2024FY2025
- Competition
- Not competedFollow-on contract (FAR 6.302-1(a)(2)(ii/iii))
- Obligated to date
- $1,080,945,590
- FA812425F0001Order under IDV FA812418D0001F117 ENGINE SUSTAINMENT SUPPORT FY25 TASK ORDER.
- Signed
- Oct 4, 2024FY2025
- Competition
- Not competedOnly one source-other (FAR 6.302-1 other)
- Obligated to date
- $1,078,914,542
- FA812425F1025Order under IDV FA861118D2850F119 CY25-CY27 ENGINE SUSTAINMENT
- Signed
- Dec 20, 2024FY2025
- Competition
- Not competedOnly one source-other (FAR 6.302-1 other)
- Obligated to date
- $1,074,249,937
- W58RGZ25F0182Order under IDV W58RGZ23D0011MODERNIZED TARGET ACQUISITION DESIGNATION SIGHT/PILOT NIGHT VISION SENSOR (M-TADS/PNVS) INDEFINITE DELIVERY/INDEFINITE QUANTITY II (IDIQ2)
- Signed
- Jun 6, 2025FY2025
- Competition
- Not competedOnly one source-other (FAR 6.302-1 other)
- Obligated to date
- $956,764,301
- N0002425C5409FY24 SM-6 BLK IA TAC AUR
- Signed
- Dec 20, 2024FY2025
- Competition
- Not competedOnly one source-other (FAR 6.302-1 other)
- Obligated to date
- $907,674,527
- FA520925F9094Order under IDV FA520957D0001US OBLIGATION IAW ART. 4 OF THE BASIC CONTRACT, MLC NO. DA-92-557-FEC-28000 (FA5209-57-D-0001) EFFECTIVE 1 OCT 1957. THIS REPORTED CONTRACT AMOUNT IS FOR GOV'T OF JAPAN SHARE.
- Signed
- Oct 1, 2024FY2025
- Competition
- Not available for competitionInternational agreement (FAR 6.302-4)
- Obligated to date
- $798,445,779
- FA852625F0002Order under IDV FA852621D0001C-17 GLOBEMASTER III - TOTAL SUSTAINMENT AND MINOR DEVELOPMENT
- Signed
- Apr 1, 2025FY2025
- Competition
- Not competedOnly one source-other (FAR 6.302-1 other)
- Obligated to date
- $790,316,943
- W31P4Q25F0082Order under IDV W31P4Q25D0010PRECISION STRIKE MISSILE EARLY OPERATIONAL CAPABILITY- 5 DELIVERY ORDER
- Signed
- Mar 28, 2025FY2025
- Competition
- Not competedOnly one source-other (FAR 6.302-1 other)
- Obligated to date
- $787,621,810
- W912CH25C0055ABRAMS ENGINEERING PROGRAM IS A MODIFICATION TO THE EXISTING ABRAMS FLEET.
- Signed
- Jun 30, 2025FY2025
- Competition
- Not competedOnly one source-other (FAR 6.302-1 other)
- Obligated to date
- $757,058,000
- W912CH25C0004THE PROCUREMENT OF 150 FLAT-BOTTOM-HULL STRYKER VEHICLES UNDER FMS CASE FOR REPUBLIC OF BULGARIA.
- Signed
- Mar 31, 2025FY2025
- Competition
- Not available for competitionInternational agreement (FAR 6.302-4)
- Obligated to date
- $678,235,815
- W31P4Q25F0182Order under IDV W31P4Q23D0014THIS T.O. WILL EXECUTE A UCA FOR DO 003 (FY25 BUY) FOR JAVELIN PRODUCT OFFICE FOR ALL UP ROUND MISSILES, BATTERY COOL UNIT, AND TOOLING WITH A NOT-TO-EXCEED (NTE) OF $900,526,210.44.
- Signed
- Aug 27, 2025FY2025
- Competition
- Not competedFollow-on contract (FAR 6.302-1(a)(2)(ii/iii))
- Obligated to date
- $675,433,329
- SPRTA125F0256Order under IDV SPRPA124D001EMANUFACTURE OF HORIZONTAL STABLIZIERS, LEFT, RIGHT AND CENTER FOR THE KC -135 AIRCRAFT.
- Signed
- Sep 25, 2025FY2025
- Competition
- Not competedOnly one source-other (FAR 6.302-1 other)
- Obligated to date
- $671,827,771
- W56KGU25F0015Order under IDV W56KGU18D0004THIS TASK ORDER PROVIDES FOR SYSTEMS ENGINEERING RESEARCH AND DEVELOPMENT FOR THE DEPARTMENT OF DEFENSE AND OTHER FEDERAL GOVERNMENT AGENCIES.
- Signed
- Aug 27, 2025FY2025
- Competition
- Not competedMobilization, essential r&d (FAR 6.302-3)
- Obligated to date
- $671,027,122
- W31P4Q25F0031Order under IDV W31P4Q24D0019PURCHASE OF HIMARS FOR US AND FMS
- Signed
- May 9, 2025FY2025
- Competition
- Not competedOnly one source-other (FAR 6.302-1 other)
- Obligated to date
- $664,125,096
- N0002425C5434FY25 LAUNCHER MISSILE MODULE (LMM)- USMC
- Signed
- Nov 12, 2024FY2025
- Competition
- Not competedOnly one source-other (FAR 6.302-1 other)
- Obligated to date
- $662,576,551
- SPRBL125F0001Order under IDV SPRBL115D0017ENGINEERING SERVICES CY25
- Signed
- Jan 31, 2025FY2025
- Competition
- Not competedOnly one source-other (FAR 6.302-1 other)
- Obligated to date
- $660,544,154
- FA862025FB072Order under IDV FA862024GB001BIG SAFARI
- Signed
- Dec 2, 2024FY2025
- Competition
- Not competedNational security (FAR 6.302-6)
- Obligated to date
- $645,778,830
- W519TC25C0032DESIGN, BUILD, AND COMMISSION A MODERN 155MM LOAD, ASSEMBLE, AND PACK (LAP) FACILITY AT THE IOWA ARMY AMMUNITION PLANT (IAAAP)
- Signed
- Aug 15, 2025FY2025
- Competition
- Not competedPublic interest (FAR 6.302-7)
- Obligated to date
- $635,200,000
- N0001925C0065NGJ-MB PRODUCTION LOT 4 SYSTEM SHIPSETS, SPARES AND NRE
- Signed
- Nov 26, 2024FY2025
- Competition
- Not competedOnly one source-other (FAR 6.302-1 other)
- Obligated to date
- $591,486,317
- N0001925F0090Order under IDV N0001924G0010THIS CONTRACT PROCURES INITIAL SPARE PARTS FOR FY25 PRODUCTION F-35 AIRCRAFT
- Signed
- Jul 31, 2025FY2025
- Competition
- Not competedOnly one source-other (FAR 6.302-1 other)
- Obligated to date
- $583,219,749